What our crews have been on lately.

A working selection of recent jobs across the three sectors. The schedule, the scope, and the photo on the wall.

EST. 1975 · Waterloo, ON51 Years on the JobCommercial · Industrial · Institutional
Manufacturing Facility — Cambridge, ON — Structural steel and metal deck ceiling — 70,000 sq ft, dryfall spray, single weekend shutdown.Completed

01 · 2024

Manufacturing Facility

Cambridge, ON

Structural steel and metal deck ceiling — 70,000 sq ft, dryfall spray, single weekend shutdown.

Industrial Plant — Kitchener, ON — Full mechanical-room repaint, two-pack epoxy on equipment, line markings restored on production floor.Completed

02 · 2024

Industrial Plant

Kitchener, ON

Full mechanical-room repaint, two-pack epoxy on equipment, line markings restored on production floor.

Hospital Corridor — Hamilton, ON — Patient-wing repaint phased over six weekends. Antimicrobial system, infection-control protocol.Completed

03 · 2024

Hospital Corridor

Hamilton, ON

Patient-wing repaint phased over six weekends. Antimicrobial system, infection-control protocol.

Parking Garage — Mississauga, ON — Three-level deck recoat, traffic markings, column striping. Phased to keep the garage open.Completed

04 · 2025

Parking Garage

Mississauga, ON

Three-level deck recoat, traffic markings, column striping. Phased to keep the garage open.

Office Building — Waterloo, ON — Tenant turnover across two floors. Walls, ceilings, common areas. Three-day window.Completed

05 · 2025

Office Building

Waterloo, ON

Tenant turnover across two floors. Walls, ceilings, common areas. Three-day window.

Storage Tank — Sarnia, ON — Exterior tank recoat. SSPC-SP6 prep, two-pack epoxy primer, polyurethane top-coat.Completed

06 · 2025

Storage Tank

Sarnia, ON

Exterior tank recoat. SSPC-SP6 prep, two-pack epoxy primer, polyurethane top-coat.

School Renovation — Guelph, ON — Hallways, classrooms, gym. Summer window. Low-VOC system. Board-approved vendor.Completed

07 · 2025

School Renovation

Guelph, ON

Hallways, classrooms, gym. Summer window. Low-VOC system. Board-approved vendor.

Hotel Repaint — Niagara Falls, ON — Full corridor repaint, floor-by-floor schedule, no guest disruption.Completed

08 · 2025

Hotel Repaint

Niagara Falls, ON

Full corridor repaint, floor-by-floor schedule, no guest disruption.

Epoxy Floor Coating — Brantford, ON — Diamond-ground prep, primer, broadcast quartz floor. 18,000 sq ft, forklift-rated.In Progress

09 · 2026

Epoxy Floor Coating

Brantford, ON

Diamond-ground prep, primer, broadcast quartz floor. 18,000 sq ft, forklift-rated.